Environmental Level Control. Magnetostrictive tank gauging. Uppsala Sweden. 2006
Installed 2006 Uppsala Sweden. 4 x underground fuel tanks. Installation with magnetostrictive gauges and Petro-link software.
Petro-link field unit digital display and comms connection for fuel island meters.
London Sovereign Ltd Harrow Bus Garage 2006
Harrow Bus Garage 2 x storage tanks. High level alarms x 2 Low level alarm x 1. Petro-link reconciliation software.
London Sovereign Harrow Bus Garage tanker delivery. High level event alarm active. Tanker driver shutting down delivery valve.
London United Busways Ltd. Stamford Brook Bus Garage London.
London Sovereign Edgware Bus Garage 2006
London Sovereign Edgware Magnetostrictive tank gauging installation 2006 (up to 4000mm)
London Sovereign Harrow Capacitance tank gauging installation 2006
(up to 20000mm)
London United Busways Hounslow Heath Bus Garage London
Oil tanks at D & SL Transport Ltd Hull. Standard installation for engine & transmission oils with the possibility of an additional tank in the future. Installed 2004
Installation for fuel oils at Advance Fuels Ltd Croydon London, 2004
Go-Ahead's new bus depot for Oxford Bus Co. 2004
2 x 100,000ltr tanks installed with petro-link gauging and protection systems. 2 x bund alarms are also integral to the unit.
The petro-link field unit is mounted in the off-set fill point cabinet for easy access for the delivery driver. The existing Normond pneumatic gauges are left installed to provide a good back up in the event of a power failure or fault.
This unit also takes in digital tank monitoring data from their other storage tanks such as engine oil, transmission oil, antifreeze, bus wash chemical & chassis wash chemical. The information is then sent via RS-485 to dedicated PC with petro-link software installed. 
Checking ullage levels during tanker delivery at Oxford Bus Garage
London General's Waterloo Bus Garage 2005 in Central London. 60,000ltr bunded tank with Identic's fuelling system and IMO double pump units. petro-link tank gauging and environmental protection alarms 
Heavy duty construction & support stand. 
London Central's Bexleyheath Bus Garage 2005
petro-link field unit again mounted next to the delivery off-set fill cabinet for easy access.
Petro-link delivery sequence
London United's Shepherds Bush Bus Garage 2005
Tanker arrives on site and the driver is preparing his delivery hose.
1/ Petro-link delivery & bund lamps MUST be indicating GREEN
2/ The storeman gains access to the petro-link panel by lifting the protection window and checks the tank volume & ullage against the drivers bill of laden & also the product grade in each compartment to guard against cross-over.

3/ Driver connects to the delivery offset fill point and opens the gate valve.
4/ Driver proceeds with delivery and periodically checks his safe ullage reading.