Loading pump controlled via a site mounted Petroman. The driver simply connects the hose coupling to the tanker faucet, presses the Petroman button and within 15 seconds gets the GREEN lamp to continue. The Oil Company can carry out their operation safe in the knowledge that costly spills and protection of the Environment has been taken care of.